278 lines
8.1 KiB
Markdown
278 lines
8.1 KiB
Markdown
# 🚀 Phase 5 Playbook — Launch & Growth
|
|
|
|
> **Duration**: 2-4 weeks (T-7 through T+14) | **Agents**: 12 | **Gate Keepers**: Studio Producer + Analytics Reporter
|
|
|
|
---
|
|
|
|
## Objective
|
|
|
|
Coordinate go-to-market execution across all channels simultaneously. Maximum impact at launch. Every marketing agent fires in concert while engineering ensures stability.
|
|
|
|
## Pre-Conditions
|
|
|
|
- [ ] Phase 4 Quality Gate passed (Reality Checker READY verdict)
|
|
- [ ] Phase 4 Handoff Package received
|
|
- [ ] Production deployment plan approved
|
|
- [ ] Marketing content pipeline ready (from Phase 3 Track B)
|
|
|
|
## Launch Timeline
|
|
|
|
### T-7: Pre-Launch Week
|
|
|
|
#### Content & Campaign Preparation (Parallel)
|
|
|
|
```
|
|
ACTIVATE Content Creator:
|
|
- Finalize all launch content (blog posts, landing pages, email sequences)
|
|
- Queue content in publishing platforms
|
|
- Prepare response templates for anticipated questions
|
|
- Create launch day real-time content plan
|
|
|
|
ACTIVATE Social Media Strategist:
|
|
- Finalize cross-platform campaign assets
|
|
- Schedule pre-launch teaser content
|
|
- Coordinate influencer partnerships
|
|
- Prepare platform-specific content variations
|
|
|
|
ACTIVATE Growth Hacker:
|
|
- Arm viral mechanics (referral codes, sharing incentives)
|
|
- Configure growth experiment tracking
|
|
- Set up funnel analytics
|
|
- Prepare acquisition channel budgets
|
|
|
|
ACTIVATE App Store Optimizer (if mobile):
|
|
- Finalize store listing (title, description, keywords, screenshots)
|
|
- Submit app for review (if applicable)
|
|
- Prepare launch day ASO adjustments
|
|
- Configure in-app review prompts
|
|
```
|
|
|
|
#### Technical Preparation (Parallel)
|
|
|
|
```
|
|
ACTIVATE DevOps Automator:
|
|
- Prepare blue-green deployment
|
|
- Verify rollback procedures
|
|
- Configure feature flags for gradual rollout
|
|
- Test deployment pipeline end-to-end
|
|
|
|
ACTIVATE Infrastructure Maintainer:
|
|
- Configure auto-scaling for 10x expected traffic
|
|
- Verify monitoring and alerting thresholds
|
|
- Test disaster recovery procedures
|
|
- Prepare incident response runbook
|
|
|
|
ACTIVATE Project Shepherd:
|
|
- Distribute launch checklist to all agents
|
|
- Confirm all dependencies resolved
|
|
- Set up launch day communication channel
|
|
- Brief stakeholders on launch plan
|
|
```
|
|
|
|
### T-1: Launch Eve
|
|
|
|
```
|
|
FINAL CHECKLIST (Project Shepherd coordinates):
|
|
|
|
Technical:
|
|
☐ Blue-green deployment tested
|
|
☐ Rollback procedure verified
|
|
☐ Auto-scaling configured
|
|
☐ Monitoring dashboards live
|
|
☐ Incident response team on standby
|
|
☐ Feature flags configured
|
|
|
|
Content:
|
|
☐ All content queued and scheduled
|
|
☐ Email sequences armed
|
|
☐ Social media posts scheduled
|
|
☐ Blog posts ready to publish
|
|
☐ Press materials distributed
|
|
|
|
Marketing:
|
|
☐ Viral mechanics tested
|
|
☐ Referral system operational
|
|
☐ Analytics tracking verified
|
|
☐ Ad campaigns ready to activate
|
|
☐ Community engagement plan ready
|
|
|
|
Support:
|
|
☐ Support team briefed
|
|
☐ FAQ and help docs published
|
|
☐ Escalation procedures confirmed
|
|
☐ Feedback collection active
|
|
```
|
|
|
|
### T-0: Launch Day
|
|
|
|
#### Hour 0: Deployment
|
|
|
|
```
|
|
ACTIVATE DevOps Automator:
|
|
1. Execute blue-green deployment to production
|
|
2. Run health checks on all services
|
|
3. Verify database migrations complete
|
|
4. Confirm all endpoints responding
|
|
5. Switch traffic to new deployment
|
|
6. Monitor error rates for 15 minutes
|
|
7. Confirm: DEPLOYMENT SUCCESSFUL or ROLLBACK
|
|
|
|
ACTIVATE Infrastructure Maintainer:
|
|
1. Monitor all system metrics in real-time
|
|
2. Watch for traffic spikes and scaling events
|
|
3. Track error rates and response times
|
|
4. Alert on any threshold breaches
|
|
5. Confirm: SYSTEMS STABLE
|
|
```
|
|
|
|
#### Hour 1-2: Marketing Activation
|
|
|
|
```
|
|
ACTIVATE Twitter Engager:
|
|
- Publish launch thread
|
|
- Engage with early responses
|
|
- Monitor brand mentions
|
|
- Amplify positive reactions
|
|
- Real-time conversation participation
|
|
|
|
ACTIVATE Reddit Community Builder:
|
|
- Post authentic launch announcement in relevant subreddits
|
|
- Engage with comments (value-first, not promotional)
|
|
- Monitor community sentiment
|
|
- Respond to technical questions
|
|
|
|
ACTIVATE Instagram Curator:
|
|
- Publish launch visual content
|
|
- Stories with product demos
|
|
- Engage with early followers
|
|
- Cross-promote with other channels
|
|
|
|
ACTIVATE TikTok Strategist:
|
|
- Publish launch videos
|
|
- Monitor for viral potential
|
|
- Engage with comments
|
|
- Adjust content based on early performance
|
|
```
|
|
|
|
#### Hour 2-8: Monitoring & Response
|
|
|
|
```
|
|
ACTIVATE Support Responder:
|
|
- Handle incoming user inquiries
|
|
- Document common issues
|
|
- Escalate technical problems to engineering
|
|
- Collect early user feedback
|
|
|
|
ACTIVATE Analytics Reporter:
|
|
- Real-time metrics dashboard
|
|
- Hourly traffic and conversion reports
|
|
- Channel attribution tracking
|
|
- User behavior flow analysis
|
|
|
|
ACTIVATE Feedback Synthesizer:
|
|
- Monitor all feedback channels
|
|
- Categorize incoming feedback
|
|
- Identify critical issues
|
|
- Prioritize user-reported problems
|
|
```
|
|
|
|
### T+1 to T+7: Post-Launch Week
|
|
|
|
```
|
|
DAILY CADENCE:
|
|
|
|
Morning:
|
|
├── Analytics Reporter → Daily metrics report
|
|
├── Feedback Synthesizer → Feedback summary
|
|
├── Infrastructure Maintainer → System health report
|
|
└── Growth Hacker → Channel performance analysis
|
|
|
|
Afternoon:
|
|
├── Content Creator → Response content based on reception
|
|
├── Social Media Strategist → Engagement optimization
|
|
├── Experiment Tracker → Launch A/B test results
|
|
└── Support Responder → Issue resolution summary
|
|
|
|
Evening:
|
|
├── Executive Summary Generator → Daily stakeholder briefing
|
|
├── Project Shepherd → Cross-team coordination
|
|
└── DevOps Automator → Deployment of hotfixes (if needed)
|
|
```
|
|
|
|
### T+7 to T+14: Optimization Week
|
|
|
|
```
|
|
ACTIVATE Growth Hacker:
|
|
- Analyze first-week acquisition data
|
|
- Optimize conversion funnels based on data
|
|
- Scale winning channels, cut losing ones
|
|
- Refine viral mechanics based on K-factor data
|
|
|
|
ACTIVATE Analytics Reporter:
|
|
- Week 1 comprehensive analysis
|
|
- Cohort analysis of launch users
|
|
- Retention curve analysis
|
|
- Revenue/engagement metrics
|
|
|
|
ACTIVATE Experiment Tracker:
|
|
- Launch systematic A/B tests
|
|
- Test onboarding variations
|
|
- Test pricing/packaging (if applicable)
|
|
- Test feature discovery flows
|
|
|
|
ACTIVATE Executive Summary Generator:
|
|
- Week 1 executive summary (SCQA format)
|
|
- Key metrics vs. targets
|
|
- Recommendations for Week 2+
|
|
- Resource reallocation suggestions
|
|
```
|
|
|
|
## Quality Gate Checklist
|
|
|
|
| # | Criterion | Evidence Source | Status |
|
|
|---|-----------|----------------|--------|
|
|
| 1 | Deployment successful (zero-downtime) | DevOps Automator deployment logs | ☐ |
|
|
| 2 | Systems stable (no P0/P1 in 48 hours) | Infrastructure Maintainer monitoring | ☐ |
|
|
| 3 | User acquisition channels active | Analytics Reporter dashboard | ☐ |
|
|
| 4 | Feedback loop operational | Feedback Synthesizer report | ☐ |
|
|
| 5 | Stakeholders informed | Executive Summary Generator output | ☐ |
|
|
| 6 | Support operational | Support Responder metrics | ☐ |
|
|
| 7 | Growth metrics tracking | Growth Hacker channel reports | ☐ |
|
|
|
|
## Gate Decision
|
|
|
|
**Dual sign-off**: Studio Producer (strategic) + Analytics Reporter (data)
|
|
|
|
- **STABLE**: Product launched, systems stable, growth active → Phase 6 activation
|
|
- **CRITICAL**: Major issues requiring immediate engineering response → Hotfix cycle
|
|
- **ROLLBACK**: Fundamental problems → Revert deployment, return to Phase 4
|
|
|
|
## Handoff to Phase 6
|
|
|
|
```markdown
|
|
## Phase 5 → Phase 6 Handoff Package
|
|
|
|
### For Ongoing Operations:
|
|
- Launch metrics baseline (Analytics Reporter)
|
|
- User feedback themes (Feedback Synthesizer)
|
|
- System performance baseline (Infrastructure Maintainer)
|
|
- Growth channel performance (Growth Hacker)
|
|
- Support issue patterns (Support Responder)
|
|
|
|
### For Continuous Improvement:
|
|
- A/B test results and learnings (Experiment Tracker)
|
|
- Process improvement recommendations (Workflow Optimizer)
|
|
- Financial performance vs. projections (Finance Tracker)
|
|
- Compliance monitoring status (Legal Compliance Checker)
|
|
|
|
### Operational Cadences Established:
|
|
- Daily: System monitoring, support, analytics
|
|
- Weekly: Analytics report, feedback synthesis, sprint planning
|
|
- Monthly: Executive summary, financial review, compliance check
|
|
- Quarterly: Strategic review, process optimization, market intelligence
|
|
```
|
|
|
|
---
|
|
|
|
*Phase 5 is complete when the product is deployed, systems are stable for 48+ hours, growth channels are active, and the feedback loop is operational.*
|